Energy projects in Botoșani
In Botoșani County, 21 projects above 1 MW are requesting grid connection, 610 MW in total. 10 have a signed connection contract.
There are 14 solar PV parks (182 MW), 5 wind farms (319 MW) and 1 battery storage facility (97 MW). The largest is 115.2 MW, and 3 projects exceed 50 MW. 8 projects hold a valid grid permit, and 3 have an expired permit.
| Project | Stage |
|---|---|
| 115.2 MW wind farm | Permit expired |
| 96.9 MW battery storage facility | Permit valid |
| 74.4 MW wind farm · Adășeni | Connection contract |
| 49.6 MW wind farm | Permit expired |
| 48.4 MW solar PV park | Permit valid |
| 47.7 MW wind farm | Connection contract |
| 35.2 MW solar PV park | Permit valid |
| 33.0 MW solar PV park | Permit valid |
| 31.8 MW wind farm | Connection contract |
| 21.3 MW solar PV park · Cătămărești-Deal | Connection contract |
| 13.2 MW solar PV park | Permit valid |
| 12.6 MW energy project | Permit expired |
| 11.0 MW solar PV park | Permit valid |
| 3.6 MW solar PV park · Ungureni | Permit valid |
| 3.5 MW solar PV park · Botoșani | Connection contract |
| 3.4 MW solar PV park · Botoșani | Connection contract |
| 3.4 MW solar PV park · Zăicești | Connection contract |
| 2.0 MW solar PV park · Vlădeni-Deal | Permit valid |
| 1.9 MW solar PV park | Connection contract |
| 1.3 MW solar PV park · Cristești | Connection contract |
| 1.0 MW solar PV park | Connection contract |
Other counties
- Alba38
- Arad90
- Argeș50
- Bacău24
- Bihor67
- Bistrița-Năsăud14
- Brașov57
- Brăila69
- Bucharest14
- Buzău37
- Caraș-Severin35
- Călărași56
- Cluj34
- Constanța112
- Covasna20
- Dâmbovița55
- Dolj129
- Galați48
- Giurgiu43
- Gorj73
- Harghita13
- Hunedoara33
- Ialomița25
- Iași27
- Ilfov42
- Maramureș21
- Mehedinți31
- Mureș55
- Neamț20
- Olt79
- Prahova41
- Satu Mare26
- Sălaj20
- Sibiu48
- Suceava16
- Teleorman44
- Timiș107
- Tulcea71
- Vaslui25
- Vâlcea22
- Vrancea25