Energy projects in Mehedinți
In Mehedinți County, 31 projects above 1 MW are requesting grid connection, 1,406 MW in total. 19 have a signed connection contract.
There are 14 solar PV parks (435 MW), 11 hybrid projects (185 MW), 3 battery storage facilities (82 MW), 1 hydropower plant (392 MW) and 1 wind farm (74 MW). The largest is 392.0 MW, and 6 projects exceed 50 MW. 5 projects hold a valid grid permit, and 7 have an expired permit.
Other counties
- Alba38
- Arad90
- Argeș50
- Bacău24
- Bihor67
- Bistrița-Năsăud14
- Botoșani21
- Brașov57
- Brăila69
- Bucharest14
- Buzău37
- Caraș-Severin35
- Călărași56
- Cluj34
- Constanța112
- Covasna20
- Dâmbovița55
- Dolj129
- Galați48
- Giurgiu43
- Gorj73
- Harghita13
- Hunedoara33
- Ialomița25
- Iași27
- Ilfov42
- Maramureș21
- Mureș55
- Neamț20
- Olt79
- Prahova41
- Satu Mare26
- Sălaj20
- Sibiu48
- Suceava16
- Teleorman44
- Timiș107
- Tulcea71
- Vaslui25
- Vâlcea22
- Vrancea25