Energy projects in Cluj

In Cluj County, 34 projects above 1 MW are requesting grid connection, 344 MW in total. 19 have a signed connection contract.

There are 32 solar PV parks (293 MW), 1 wind farm (50 MW) and 1 hydropower plant (2 MW). The largest is 50.1 MW. 14 projects hold a valid grid permit, and 1 has an expired permit.

ProjectStage
50.1 MW solar PV park · MoldoveneștiPermit valid
49.5 MW wind farm · SăcuieuConnection contract
49.5 MW solar PV parkPermit valid
32.1 MW solar PV park · Mintiu GherliiConnection contract
29.4 MW solar PV park · TurdaConnection contract
20.0 MW solar PV parkPermit valid
9.9 MW solar PV parkConnection contract
5.8 MW solar PV park · BonțidaPermit valid
5.2 MW solar PV park · ApahidaPermit valid
5.0 MW solar PV park · Mihai ViteazuConnection contract
5.0 MW solar PV park · Mihai ViteazuConnection contract
5.0 MW solar PV park · IaraConnection contract
5.0 MW solar PV parkPermit valid
5.0 MW solar PV park · ApahidaConnection contract
5.0 MW solar PV park · ApahidaConnection contract
5.0 MW solar PV park · DejPermit valid
4.9 MW solar PV park · IaraConnection contract
4.8 MW solar PV park · Cluj-NapocaConnection contract
4.8 MW solar PV park · FeleacuConnection contract
4.5 MW solar PV park · BorșaConnection contract
4.2 MW solar PV park · MoldoveneștiPermit valid
4.1 MW solar PV park · IclodConnection contract
3.8 MW solar PV park · Fizeșu GherliiPermit valid
3.6 MW solar PV park · ApahidaPermit valid
3.0 MW solar PV park · CuzdrioaraConnection contract
3.0 MW solar PV parkConnection contract
2.7 MW solar PV parkConnection contract
2.7 MW solar PV park · TurdaPermit expired
2.4 MW solar PV park · ApahidaPermit valid
2.1 MW solar PV park · CâțcăuConnection contract
2.0 MW solar PV park · MoldoveneștiPermit valid
2.0 MW solar PV park · MoldoveneștiConnection contract
1.9 MW hydropower plantPermit valid
1.4 MW solar PV parkPermit valid