Energy projects in Caraș-Severin

In Caraș-Severin County, 35 projects above 1 MW are requesting grid connection, 2,870 MW in total. 25 have a signed connection contract.

There are 19 solar PV parks (946 MW), 10 wind farms (1,365 MW), 3 battery storage facilities (289 MW) and 1 hydropower plant (22 MW). The largest is 260.0 MW, and 18 projects exceed 50 MW. 7 projects hold a valid grid permit, and 3 have an expired permit.

ProjectStage
260.0 MW solar PV parkConnection contract
230.0 MW solar PV parkConnection contract
208.6 MW wind farmPermit valid
201.9 MW wind farmPermit valid
196.3 MW wind farmPermit valid
195.2 MW energy projectConnection contract
170.0 MW solar PV parkConnection contract
142.4 MW wind farm · CoroniniConnection contract
140.0 MW solar PV parkConnection contract
139.0 MW wind farmConnection contract
133.2 MW wind farmConnection contract
132.8 MW wind farmConnection contract
108.8 MW wind farmConnection contract
98.6 MW battery storage facility · ObrejaPermit valid
95.3 MW battery storage facilityPermit valid
95.3 MW battery storage facilityPermit valid
56.1 MW wind farm · CiuchiciConnection contract
51.8 MW energy projectPermit expired
49.4 MW solar PV park · MăureniConnection contract
46.2 MW wind farmConnection contract
45.0 MW solar PV park · PăltinișPermit expired
21.9 MW hydropower plant · Băile HerculaneConnection contract
6.9 MW solar PV park · CaransebeșConnection contract
6.9 MW solar PV park · ReșițaConnection contract
6.1 MW solar PV park · AninaConnection contract
6.0 MW solar PV park · MăureniConnection contract
5.0 MW solar PV parkPermit expired
4.7 MW solar PV park · BuchinConnection contract
4.0 MW solar PV parkConnection contract
3.5 MW solar PV park · ForoticConnection contract
3.0 MW solar PV parkConnection contract
1.8 MW solar PV parkConnection contract
1.4 MW solar PV parkPermit valid
1.4 MW solar PV park · VoislovaConnection contract
1.1 MW solar PV park · CaransebeșConnection contract