Energy projects in Hunedoara
In Hunedoara County, 33 projects above 1 MW are requesting grid connection, 744 MW in total. 27 have a signed connection contract.
There are 28 solar PV parks (416 MW), 2 battery storage facilities (204 MW) and 2 hydropower plants (70 MW). The largest is 122.6 MW, and 3 projects exceed 50 MW. 3 projects hold a valid grid permit, and 3 have an expired permit.