In Călărași County, 56 projects above 1 MW are requesting grid connection, 2,259 MW in total. 35 have a signed connection contract.
There are 40 solar PV parks (618 MW), 6 hybrid projects (551 MW), 4 battery storage facilities (414 MW) and 2 wind farms (401 MW). The largest is 250.6 MW, and 12 projects exceed 50 MW. 14 projects hold a valid grid permit, and 7 have an expired permit.