Energy projects in Mureș

In Mureș County, 55 projects above 1 MW are requesting grid connection, 1,928 MW in total. 48 have a signed connection contract.

There are 46 solar PV parks (580 MW), 5 battery storage facilities (731 MW), 1 hybrid project (156 MW) and 1 hydropower plant (35 MW). The largest is 379.4 MW, and 6 projects exceed 50 MW. 6 projects hold a valid grid permit, and 1 has an expired permit.

ProjectStage
379.4 MW energy projectPermit expired
334.7 MW battery storage facilityConnection contract
156.0 MW hybrid projectConnection contract
139.7 MW battery storage facilityConnection contract
137.8 MW battery storage facilityPermit valid
84.6 MW battery storage facilityPermit valid
50.0 MW solar PV park · VoivodeniConnection contract
50.0 MW solar PV parkConnection contract
50.0 MW solar PV park · AdămușConnection contract
50.0 MW solar PV parkConnection contract
49.4 MW solar PV park · GlodeniConnection contract
48.0 MW solar PV parkConnection contract
46.2 MW energy projectPermit valid
40.8 MW solar PV park · MădărașConnection contract
40.0 MW solar PV parkConnection contract
35.0 MW hydropower plantConnection contract
34.3 MW battery storage facilityConnection contract
34.0 MW solar PV parkConnection contract
31.0 MW solar PV parkConnection contract
18.0 MW solar PV parkConnection contract
10.0 MW solar PV parkConnection contract
7.0 MW solar PV park · CipăuConnection contract
5.0 MW solar PV parkConnection contract
4.9 MW solar PV park · PeteleaConnection contract
4.9 MW solar PV parkConnection contract
4.9 MW solar PV park · Sângeorgiu de MureșConnection contract
4.9 MW solar PV park · AcățariConnection contract
4.9 MW solar PV park · PănetConnection contract
4.9 MW solar PV park · SolovăstruConnection contract
4.5 MW solar PV park · HetiurPermit valid
4.1 MW solar PV park · PeteleaConnection contract
4.0 MW solar PV parkConnection contract
3.8 MW solar PV park · ȘincaiConnection contract
3.6 MW solar PV park · GurghiuConnection contract
3.5 MW solar PV parkConnection contract
3.2 MW solar PV park · Sângeorgiu de MureșConnection contract
3.2 MW solar PV park · SânpaulConnection contract
3.0 MW solar PV park · CristeștiConnection contract
2.9 MW solar PV park · Sângeorgiu de PădureConnection contract
2.9 MW solar PV park · Sângeorgiu de PădureConnection contract
2.8 MW solar PV park · Coasta MareConnection contract
2.8 MW solar PV park · Ideciu de JosConnection contract
2.8 MW solar PV park · CucerdeaConnection contract
2.8 MW solar PV park · VidrasăuConnection contract
2.3 MW solar PV park · GhindariConnection contract
2.1 MW solar PV park · UngheniConnection contract
2.0 MW solar PV park · NadeșConnection contract
2.0 MW solar PV park · CristeștiConnection contract
1.9 MW solar PV park · Târgu MureșConnection contract
1.5 MW solar PV park · DaneșConnection contract
1.4 MW solar PV park · MicaConnection contract
1.3 MW solar PV park · SuplacConnection contract
1.2 MW solar PV parkConnection contract
1.0 MW solar PV parkPermit valid
1.0 MW solar PV parkPermit valid