Energy projects in Bistrița-Năsăud

In Bistrița-Năsăud County, 14 projects above 1 MW are requesting grid connection, 100 MW in total. 11 have a signed connection contract.

There are 12 solar PV parks (94 MW) and 2 hydropower plants (6 MW). The largest is 50.0 MW. 2 projects hold a valid grid permit, and 1 has an expired permit.

ProjectStage
50.0 MW solar PV park · LivezileConnection contract
15.0 MW solar PV parkConnection contract
5.0 MW solar PV parkPermit valid
4.9 MW solar PV parkConnection contract
4.6 MW solar PV parkConnection contract
3.9 MW solar PV park · BistrițaConnection contract
3.2 MW hydropower plant · ParvaConnection contract
3.0 MW hydropower plant · MăieruPermit valid
2.4 MW solar PV park · MărișeluConnection contract
2.4 MW solar PV parkPermit expired
2.0 MW solar PV parkConnection contract
2.0 MW solar PV park · Șieu-MăgherușConnection contract
1.0 MW solar PV park · UriuConnection contract
1.0 MW solar PV park · UriuConnection contract