Energy projects in Suceava
In Suceava County, 16 projects above 1 MW are requesting grid connection, 846 MW in total. 10 have a signed connection contract.
There are 12 solar PV parks (68 MW), 1 hybrid project (771 MW), 1 battery storage facility (2 MW) and 1 hydropower plant (2 MW). The largest is 771.0 MW. 4 projects hold a valid grid permit, and 2 have an expired permit.
| Project | Stage |
|---|---|
| 771.0 MW hybrid project | Connection contract |
| 47.1 MW solar PV park | Connection contract |
| 4.8 MW solar PV park · Mitocu Dragomirnei | Connection contract |
| 2.8 MW energy project | Permit expired |
| 2.4 MW battery storage facility | Permit valid |
| 2.0 MW solar PV park · Pilugani | Connection contract |
| 2.0 MW solar PV park · Fundu Moldovei | Permit valid |
| 2.0 MW hydropower plant · Șaru Dornei | Connection contract |
| 2.0 MW solar PV park · Ciprian Porumbescu | Connection contract |
| 1.9 MW solar PV park · Părteștii de Jos | Connection contract |
| 1.6 MW solar PV park · Bulai | Permit valid |
| 1.6 MW solar PV park · Udești | Permit valid |
| 1.4 MW solar PV park · Poiana Stampei | Permit expired |
| 1.4 MW solar PV park · Cajvana | Connection contract |
| 1.0 MW solar PV park · Vulturești | Connection contract |
| 1.0 MW solar PV park · Breaza | Connection contract |
Other counties
- Alba38
- Arad90
- Argeș50
- Bacău24
- Bihor67
- Bistrița-Năsăud14
- Botoșani21
- Brașov57
- Brăila69
- Bucharest14
- Buzău37
- Caraș-Severin35
- Călărași56
- Cluj34
- Constanța112
- Covasna20
- Dâmbovița55
- Dolj129
- Galați48
- Giurgiu43
- Gorj73
- Harghita13
- Hunedoara33
- Ialomița25
- Iași27
- Ilfov42
- Maramureș21
- Mehedinți31
- Mureș55
- Neamț20
- Olt79
- Prahova41
- Satu Mare26
- Sălaj20
- Sibiu48
- Teleorman44
- Timiș107
- Tulcea71
- Vaslui25
- Vâlcea22
- Vrancea25