Energy projects in Neamț
In Neamț County, 20 projects above 1 MW are requesting grid connection, 1,379 MW in total. 7 have a signed connection contract.
There are 10 solar PV parks (69 MW), 6 battery storage facilities (750 MW), 1 hydropower plant (210 MW), 1 hybrid project (48 MW) and 1 biomass plant (7 MW). The largest is 295.5 MW, and 8 projects exceed 50 MW. 10 projects hold a valid grid permit, and 3 have an expired permit.
| Project | Stage |
|---|---|
| 295.5 MW energy project | Connection contract |
| 210.0 MW hydropower plant | Connection contract |
| 201.1 MW battery storage facility | Permit valid |
| 197.9 MW battery storage facility | Connection contract |
| 121.1 MW battery storage facility | Permit valid |
| 96.6 MW battery storage facility | Permit valid |
| 81.9 MW battery storage facility | Permit valid |
| 51.3 MW battery storage facility | Connection contract |
| 49.7 MW solar PV park | Permit expired |
| 47.6 MW hybrid project | Permit valid |
| 6.5 MW biomass plant · Stejaru | Permit valid |
| 4.0 MW solar PV park · Dumbrava Roșie | Connection contract |
| 3.7 MW solar PV park · Traian | Connection contract |
| 3.0 MW solar PV park | Permit valid |
| 2.2 MW solar PV park · Vad | Permit valid |
| 2.0 MW solar PV park · Piatra Neamț | Permit expired |
| 1.5 MW solar PV park · Davideni | Connection contract |
| 1.1 MW solar PV park · Piatra Neamț | Permit valid |
| 1.0 MW solar PV park · Horia | Permit valid |
| 1.0 MW solar PV park · Piatra Neamț | Permit expired |
Other counties
- Alba38
- Arad90
- Argeș50
- Bacău24
- Bihor67
- Bistrița-Năsăud14
- Botoșani21
- Brașov57
- Brăila69
- Bucharest14
- Buzău37
- Caraș-Severin35
- Călărași56
- Cluj34
- Constanța112
- Covasna20
- Dâmbovița55
- Dolj129
- Galați48
- Giurgiu43
- Gorj73
- Harghita13
- Hunedoara33
- Ialomița25
- Iași27
- Ilfov42
- Maramureș21
- Mehedinți31
- Mureș55
- Olt79
- Prahova41
- Satu Mare26
- Sălaj20
- Sibiu48
- Suceava16
- Teleorman44
- Timiș107
- Tulcea71
- Vaslui25
- Vâlcea22
- Vrancea25