Battery storage facilities in Neamț

In Neamț County, 6 battery storage projects above 1 MW are requesting grid connection, 750 MW in total. 2 have a signed connection contract.

The largest is 201.1 MW, and 6 projects exceed 50 MW. 4 projects hold a valid grid permit.