Energy projects in Bucharest
In Bucharest, 14 projects above 1 MW are requesting grid connection, 134 MW in total. 12 have a signed connection contract.
There are 10 solar PV parks (26 MW) and 2 cogeneration plants (57 MW). The largest is 47.9 MW. 2 projects hold a valid grid permit.
| Project | Stage |
|---|---|
| Energy project 47.9 MW · București | Connection contract |
| 45.7 MW cogeneration plant | Connection contract |
| 10.9 MW cogeneration plant | Connection contract |
| 5.2 MW solar PV park · Sector 6 | Connection contract |
| 5.0 MW solar PV park · Sector 3 | Connection contract |
| 4.8 MW solar PV park · Sector 4 | Permit valid |
| 3.0 MW energy project | Connection contract |
| 2.4 MW solar PV park · Sector 4 | Permit valid |
| 2.2 MW solar PV park · Sector 4 | Connection contract |
| 1.6 MW solar PV park · Sector 6 | Connection contract |
| 1.5 MW solar PV park · Sector 3 | Connection contract |
| 1.2 MW solar PV park · Sector 3 | Connection contract |
| 1.2 MW solar PV park · Bucharest | Connection contract |
| 1.0 MW solar PV park · Sector 6 | Connection contract |
Other counties
- Alba38
- Arad90
- Argeș50
- Bacău24
- Bihor67
- Bistrița-Năsăud14
- Botoșani21
- Brașov57
- Brăila69
- Buzău37
- Caraș-Severin35
- Călărași56
- Cluj34
- Constanța112
- Covasna20
- Dâmbovița55
- Dolj129
- Galați48
- Giurgiu43
- Gorj73
- Harghita13
- Hunedoara33
- Ialomița25
- Iași27
- Ilfov42
- Maramureș21
- Mehedinți31
- Mureș55
- Neamț20
- Olt79
- Prahova41
- Satu Mare26
- Sălaj20
- Sibiu48
- Suceava16
- Teleorman44
- Timiș107
- Tulcea71
- Vaslui25
- Vâlcea22
- Vrancea25