Solar PV parks in Bucharest
In Bucharest, 10 solar PV projects above 1 MW are requesting grid connection, 26 MW in total. 8 have a signed connection contract.
The largest is 5.2 MW. 2 projects hold a valid grid permit.
| Project | Stage |
|---|---|
| 5.2 MW solar PV park · Sector 6 | Connection contract |
| 5.0 MW solar PV park · Sector 3 | Connection contract |
| 4.8 MW solar PV park · Sector 4 | Permit valid |
| 2.4 MW solar PV park · Sector 4 | Permit valid |
| 2.2 MW solar PV park · Sector 4 | Connection contract |
| 1.6 MW solar PV park · Sector 6 | Connection contract |
| 1.5 MW solar PV park · Sector 3 | Connection contract |
| 1.2 MW solar PV park · Sector 3 | Connection contract |
| 1.2 MW solar PV park · Bucharest | Connection contract |
| 1.0 MW solar PV park · Sector 6 | Connection contract |
Other counties
- Alba38
- Arad90
- Argeș50
- Bacău24
- Bihor67
- Bistrița-Năsăud14
- Botoșani21
- Brașov57
- Brăila69
- Buzău37
- Caraș-Severin35
- Călărași56
- Cluj34
- Constanța112
- Covasna20
- Dâmbovița55
- Dolj129
- Galați48
- Giurgiu43
- Gorj73
- Harghita13
- Hunedoara33
- Ialomița25
- Iași27
- Ilfov42
- Maramureș21
- Mehedinți31
- Mureș55
- Neamț20
- Olt79
- Prahova41
- Satu Mare26
- Sălaj20
- Sibiu48
- Suceava16
- Teleorman44
- Timiș107
- Tulcea71
- Vaslui25
- Vâlcea22
- Vrancea25