Energy projects in Harghita
In Harghita County, 13 projects above 1 MW are requesting grid connection, 308 MW in total. 8 have a signed connection contract.
There are 10 solar PV parks (211 MW), 1 battery storage facility (85 MW), 1 biomass plant (8 MW) and 1 hydropower plant (5 MW). The largest is 84.6 MW, and 2 projects exceed 50 MW. 2 projects hold a valid grid permit, and 3 have an expired permit.
| Project | Stage |
|---|---|
| 84.6 MW battery storage facility | Permit valid |
| 66.0 MW solar PV park · Lunca de Sus | Permit expired |
| 50.0 MW solar PV park · Corund | Permit expired |
| 50.0 MW solar PV park · Corund | Permit expired |
| 30.0 MW solar PV park · Lăzarea | Connection contract |
| 7.5 MW biomass plant · Satu Mare | Connection contract |
| 5.2 MW hydropower plant · Toplița | Connection contract |
| 4.8 MW solar PV park · Toplița | Connection contract |
| 3.0 MW solar PV park · Satu Mare | Connection contract |
| 3.0 MW solar PV park · Tomești | Connection contract |
| 2.1 MW solar PV park · Satu Mare | Permit valid |
| 1.1 MW solar PV park | Connection contract |
| 1.1 MW solar PV park | Connection contract |
Other counties
- Alba38
- Arad90
- Argeș50
- Bacău24
- Bihor67
- Bistrița-Năsăud14
- Botoșani21
- Brașov57
- Brăila69
- Bucharest14
- Buzău37
- Caraș-Severin35
- Călărași56
- Cluj34
- Constanța112
- Covasna20
- Dâmbovița55
- Dolj129
- Galați48
- Giurgiu43
- Gorj73
- Hunedoara33
- Ialomița25
- Iași27
- Ilfov42
- Maramureș21
- Mehedinți31
- Mureș55
- Neamț20
- Olt79
- Prahova41
- Satu Mare26
- Sălaj20
- Sibiu48
- Suceava16
- Teleorman44
- Timiș107
- Tulcea71
- Vaslui25
- Vâlcea22
- Vrancea25