Energy projects in Sălaj
In Sălaj County, 20 projects above 1 MW are requesting grid connection, 714 MW in total. 15 have a signed connection contract.
There are 16 solar PV parks (364 MW), 1 hybrid project (131 MW) and 1 battery storage facility (89 MW). The largest is 131.3 MW, and 5 projects exceed 50 MW. 4 projects hold a valid grid permit, and 1 has an expired permit.
| Project | Stage |
|---|---|
| 131.3 MW hybrid project | Permit valid |
| 93.4 MW solar PV park | Connection contract |
| 89.4 MW battery storage facility · Surduc | Connection contract |
| 78.1 MW energy project | Permit expired |
| 51.0 MW energy project | Connection contract |
| 50.0 MW solar PV park | Connection contract |
| 49.9 MW solar PV park | Connection contract |
| 45.0 MW solar PV park | Connection contract |
| 45.0 MW solar PV park | Connection contract |
| 45.0 MW solar PV park | Connection contract |
| 4.8 MW solar PV park | Permit valid |
| 4.8 MW solar PV park · Boghiș | Connection contract |
| 4.8 MW solar PV park | Connection contract |
| 4.5 MW solar PV park | Permit valid |
| 3.9 MW solar PV park · Băbeni | Connection contract |
| 3.5 MW solar PV park · Crișeni | Connection contract |
| 3.3 MW solar PV park · Zalău | Permit valid |
| 3.0 MW solar PV park · Băbeni | Connection contract |
| 2.6 MW solar PV park · Hida | Connection contract |
| 1.0 MW solar PV park · Zalău | Connection contract |
Other counties
- Alba38
- Arad90
- Argeș50
- Bacău24
- Bihor67
- Bistrița-Năsăud14
- Botoșani21
- Brașov57
- Brăila69
- Bucharest14
- Buzău37
- Caraș-Severin35
- Călărași56
- Cluj34
- Constanța112
- Covasna20
- Dâmbovița55
- Dolj129
- Galați48
- Giurgiu43
- Gorj73
- Harghita13
- Hunedoara33
- Ialomița25
- Iași27
- Ilfov42
- Maramureș21
- Mehedinți31
- Mureș55
- Neamț20
- Olt79
- Prahova41
- Satu Mare26
- Sibiu48
- Suceava16
- Teleorman44
- Timiș107
- Tulcea71
- Vaslui25
- Vâlcea22
- Vrancea25