Solar PV parks in Bistrița-Năsăud
In Bistrița-Năsăud County, 12 solar PV projects above 1 MW are requesting grid connection, 94 MW in total. 10 have a signed connection contract.
The largest is 50.0 MW. 1 project holds a valid grid permit, and 1 has an expired permit.
| Project | Stage |
|---|---|
| 50.0 MW solar PV park · Livezile | Connection contract |
| 15.0 MW solar PV park | Connection contract |
| 5.0 MW solar PV park | Permit valid |
| 4.9 MW solar PV park | Connection contract |
| 4.6 MW solar PV park | Connection contract |
| 3.9 MW solar PV park · Bistrița | Connection contract |
| 2.4 MW solar PV park · Mărișelu | Connection contract |
| 2.4 MW solar PV park | Permit expired |
| 2.0 MW solar PV park | Connection contract |
| 2.0 MW solar PV park · Șieu-Măgheruș | Connection contract |
| 1.0 MW solar PV park · Uriu | Connection contract |
| 1.0 MW solar PV park · Uriu | Connection contract |
Other counties
- Alba38
- Arad90
- Argeș50
- Bacău24
- Bihor67
- Botoșani21
- Brașov57
- Brăila69
- Bucharest14
- Buzău37
- Caraș-Severin35
- Călărași56
- Cluj34
- Constanța112
- Covasna20
- Dâmbovița55
- Dolj129
- Galați48
- Giurgiu43
- Gorj73
- Harghita13
- Hunedoara33
- Ialomița25
- Iași27
- Ilfov42
- Maramureș21
- Mehedinți31
- Mureș55
- Neamț20
- Olt79
- Prahova41
- Satu Mare26
- Sălaj20
- Sibiu48
- Suceava16
- Teleorman44
- Timiș107
- Tulcea71
- Vaslui25
- Vâlcea22
- Vrancea25