Wind farms in Caraș-Severin
In Caraș-Severin County, 10 wind projects above 1 MW are requesting grid connection, 1,365 MW in total. 7 have a signed connection contract.
The largest is 208.6 MW, and 9 projects exceed 50 MW. 3 projects hold a valid grid permit.
| Project | Stage |
|---|---|
| 208.6 MW wind farm | Permit valid |
| 201.9 MW wind farm | Permit valid |
| 196.3 MW wind farm | Permit valid |
| 142.4 MW wind farm · Coronini | Connection contract |
| 139.0 MW wind farm | Connection contract |
| 133.2 MW wind farm | Connection contract |
| 132.8 MW wind farm | Connection contract |
| 108.8 MW wind farm | Connection contract |
| 56.1 MW wind farm · Ciuchici | Connection contract |
| 46.2 MW wind farm | Connection contract |
Other counties
- Alba38
- Arad90
- Argeș50
- Bacău24
- Bihor67
- Bistrița-Năsăud14
- Botoșani21
- Brașov57
- Brăila69
- Bucharest14
- Buzău37
- Călărași56
- Cluj34
- Constanța112
- Covasna20
- Dâmbovița55
- Dolj129
- Galați48
- Giurgiu43
- Gorj73
- Harghita13
- Hunedoara33
- Ialomița25
- Iași27
- Ilfov42
- Maramureș21
- Mehedinți31
- Mureș55
- Neamț20
- Olt79
- Prahova41
- Satu Mare26
- Sălaj20
- Sibiu48
- Suceava16
- Teleorman44
- Timiș107
- Tulcea71
- Vaslui25
- Vâlcea22
- Vrancea25