In Caraș-Severin County, 19 solar PV projects above 1 MW are requesting grid connection, 946 MW in total. 16 have a signed connection contract.
The largest is 260.0 MW, and 4 projects exceed 50 MW. 1 project holds a valid grid permit, and 2 have an expired permit.
| Project | Stage |
|---|---|
| 260.0 MW solar PV park | Connection contract |
| 230.0 MW solar PV park | Connection contract |
| 170.0 MW solar PV park | Connection contract |
| 140.0 MW solar PV park | Connection contract |
| 49.4 MW solar PV park · Măureni | Connection contract |
| 45.0 MW solar PV park · Păltiniș | Permit expired |
| 6.9 MW solar PV park · Caransebeș | Connection contract |
| 6.9 MW solar PV park · Reșița | Connection contract |
| 6.1 MW solar PV park · Anina | Connection contract |
| 6.0 MW solar PV park · Măureni | Connection contract |
| 5.0 MW solar PV park | Permit expired |
| 4.7 MW solar PV park · Buchin | Connection contract |
| 4.0 MW solar PV park | Connection contract |
| 3.5 MW solar PV park · Forotic | Connection contract |
| 3.0 MW solar PV park | Connection contract |
| 1.8 MW solar PV park | Connection contract |
| 1.4 MW solar PV park | Permit valid |
| 1.4 MW solar PV park · Voislova | Connection contract |
| 1.1 MW solar PV park · Caransebeș | Connection contract |
Other counties
- Alba38
- Arad90
- Argeș50
- Bacău24
- Bihor67
- Bistrița-Năsăud14
- Botoșani21
- Brașov57
- Brăila69
- Bucharest14
- Buzău37
- Călărași56
- Cluj34
- Constanța112
- Covasna20
- Dâmbovița55
- Dolj129
- Galați48
- Giurgiu43
- Gorj73
- Harghita13
- Hunedoara33
- Ialomița25
- Iași27
- Ilfov42
- Maramureș21
- Mehedinți31
- Mureș55
- Neamț20
- Olt79
- Prahova41
- Satu Mare26
- Sălaj20
- Sibiu48
- Suceava16
- Teleorman44
- Timiș107
- Tulcea71
- Vaslui25
- Vâlcea22
- Vrancea25