Hybrid projects in Mehedinți
In Mehedinți County, 11 hybrid projects above 1 MW are requesting grid connection, 185 MW in total. 9 have a signed connection contract.
The largest is 62.7 MW. 2 projects hold a valid grid permit.
| Project | Stage |
|---|---|
| 62.7 MW hybrid project · Gârla Mare | Connection contract |
| 45.9 MW hybrid project · Gârla Mare | Connection contract |
| 45.9 MW hybrid project · Gârla Mare | Connection contract |
| 5.0 MW hybrid project | Connection contract |
| 5.0 MW hybrid project | Connection contract |
| 4.9 MW hybrid project · Șimian | Connection contract |
| 4.8 MW hybrid project · Gogoșu | Connection contract |
| 3.0 MW hybrid project · Vânători | Connection contract |
| 2.9 MW hybrid project | Permit valid |
| 2.8 MW hybrid project | Permit valid |
| 2.0 MW hybrid project · Pristol | Connection contract |
Other counties
- Alba38
- Arad90
- Argeș50
- Bacău24
- Bihor67
- Bistrița-Năsăud14
- Botoșani21
- Brașov57
- Brăila69
- Bucharest14
- Buzău37
- Caraș-Severin35
- Călărași56
- Cluj34
- Constanța112
- Covasna20
- Dâmbovița55
- Dolj129
- Galați48
- Giurgiu43
- Gorj73
- Harghita13
- Hunedoara33
- Ialomița25
- Iași27
- Ilfov42
- Maramureș21
- Mureș55
- Neamț20
- Olt79
- Prahova41
- Satu Mare26
- Sălaj20
- Sibiu48
- Suceava16
- Teleorman44
- Timiș107
- Tulcea71
- Vaslui25
- Vâlcea22
- Vrancea25