Battery storage facilities in Argeș

In Argeș County, 6 battery storage projects above 1 MW are requesting grid connection, 654 MW in total. 2 have a signed connection contract.

The largest is 299.0 MW, and 3 projects exceed 50 MW. 1 project holds a valid grid permit, and 3 have an expired permit.