Hybrid projects in Bacău

In Bacău County, 5 hybrid projects above 1 MW are requesting grid connection, 936 MW in total. 2 have a signed connection contract.

The largest is 449.1 MW, and 3 projects exceed 50 MW. 3 projects hold a valid grid permit.

ProjectStage
449.1 MW hybrid projectPermit valid
206.9 MW hybrid projectPermit valid
192.0 MW hybrid projectConnection contract
48.9 MW hybrid projectConnection contract
39.6 MW hybrid projectPermit valid