Solar PV parks in Bihor

In Bihor County, 59 solar PV projects above 1 MW are requesting grid connection, 1,634 MW in total. 45 have a signed connection contract.

The largest is 586.8 MW, and 6 projects exceed 50 MW. 12 projects hold a valid grid permit, and 2 have an expired permit.

ProjectStage
586.8 MW solar PV parkConnection contract
89.1 MW solar PV park · ȚețcheaConnection contract
77.5 MW solar PV park · CefaConnection contract
70.4 MW solar PV parkPermit valid
61.8 MW solar PV park · SăcădatConnection contract
59.1 MW solar PV parkConnection contract
49.0 MW solar PV park · SântandreiConnection contract
49.0 MW solar PV park · SântandreiConnection contract
49.0 MW solar PV park · AlpareaConnection contract
48.1 MW solar PV park · OșorheiConnection contract
45.2 MW solar PV park · BeiușConnection contract
45.2 MW solar PV park · BeiușConnection contract
42.9 MW solar PV park · AștileuConnection contract
41.4 MW solar PV park · Avram IancuConnection contract
40.0 MW solar PV park · DiosigPermit valid
35.0 MW solar PV park · AștileuConnection contract
32.0 MW solar PV park · Avram IancuConnection contract
29.4 MW solar PV park · ChișlazConnection contract
28.5 MW solar PV park · Avram IancuConnection contract
21.7 MW solar PV park · Avram IancuPermit valid
9.0 MW solar PV park · AbrămuțConnection contract
8.2 MW solar PV parkConnection contract
7.7 MW solar PV park · Avram IancuPermit valid
5.0 MW solar PV parkConnection contract
5.0 MW solar PV park · Lazuri de BeiușPermit valid
5.0 MW solar PV parkConnection contract
4.5 MW solar PV parkConnection contract
4.1 MW solar PV park · LuncaPermit valid
4.1 MW solar PV parkConnection contract
4.0 MW solar PV park · BorșConnection contract
4.0 MW solar PV parkConnection contract
4.0 MW solar PV park · GepiuConnection contract
4.0 MW solar PV park · BihariaConnection contract
4.0 MW solar PV parkPermit valid
4.0 MW solar PV parkConnection contract
3.9 MW solar PV park · RoșioriPermit valid
3.9 MW solar PV park · ChișlazPermit expired
3.7 MW solar PV park · SălardPermit valid
3.5 MW solar PV parkConnection contract
3.0 MW solar PV park · DrăgăneștiPermit valid
3.0 MW solar PV park · PopeștiConnection contract
3.0 MW solar PV parkConnection contract
2.9 MW solar PV park · NojoridConnection contract
2.8 MW solar PV park · CiumeghiuConnection contract
2.7 MW solar PV park · OșorheiConnection contract
2.6 MW solar PV parkConnection contract
2.2 MW solar PV park · SântandreiPermit expired
2.2 MW solar PV park · SântandreiConnection contract
2.1 MW solar PV park · ChișlazConnection contract
2.0 MW solar PV parkPermit valid
1.9 MW solar PV park · SântandreiConnection contract
1.8 MW solar PV park · AbramConnection contract
1.7 MW solar PV park · CiumeghiuConnection contract
1.3 MW solar PV park · OradeaConnection contract
1.3 MW solar PV park · OradeaPermit valid
1.3 MW solar PV park · BorodConnection contract
1.1 MW solar PV park · BratcaConnection contract
1.1 MW solar PV park · Sânnicolau-RomânConnection contract
1.0 MW solar PV park · OradeaConnection contract