Wind farms in Brăila
In Brăila County, 18 wind projects above 1 MW are requesting grid connection, 1,075 MW in total. 11 have a signed connection contract.
The largest is 287.2 MW, and 6 projects exceed 50 MW. 5 projects hold a valid grid permit, and 2 have an expired permit.
| Project | Stage |
|---|---|
| 287.2 MW wind farm | Connection contract |
| 116.8 MW wind farm | Connection contract |
| 96.9 MW wind farm · Traian | Connection contract |
| 75.3 MW wind farm | Permit expired |
| 69.9 MW wind farm · Traian | Connection contract |
| 57.6 MW wind farm · Zăvoaia | Permit valid |
| 49.6 MW wind farm · Tufești | Connection contract |
| 49.6 MW wind farm · Tichilești | Connection contract |
| 49.6 MW wind farm | Connection contract |
| 49.6 MW wind farm · Stăncuța | Permit valid |
| 49.6 MW wind farm · Unirea | Connection contract |
| 48.0 MW wind farm | Permit valid |
| 29.9 MW wind farm | Permit expired |
| 10.0 MW wind farm | Permit valid |
| 10.0 MW wind farm | Connection contract |
| 9.6 MW wind farm | Connection contract |
| 8.0 MW wind farm · Bărăganul | Connection contract |
| 8.0 MW wind farm · Bărăganul | Permit valid |
Other counties
- Alba38
- Arad90
- Argeș50
- Bacău24
- Bihor67
- Bistrița-Năsăud14
- Botoșani21
- Brașov57
- Bucharest14
- Buzău37
- Caraș-Severin35
- Călărași56
- Cluj34
- Constanța112
- Covasna20
- Dâmbovița55
- Dolj129
- Galați48
- Giurgiu43
- Gorj73
- Harghita13
- Hunedoara33
- Ialomița25
- Iași27
- Ilfov42
- Maramureș21
- Mehedinți31
- Mureș55
- Neamț20
- Olt79
- Prahova41
- Satu Mare26
- Sălaj20
- Sibiu48
- Suceava16
- Teleorman44
- Timiș107
- Tulcea71
- Vaslui25
- Vâlcea22
- Vrancea25