Hybrid projects in Timiș

In Timiș County, 8 hybrid projects above 1 MW are requesting grid connection, 582 MW in total. 1 has a signed connection contract.

The largest is 244.4 MW, and 2 projects exceed 50 MW. 7 projects hold a valid grid permit.

ProjectStage
244.4 MW hybrid projectConnection contract
86.0 MW hybrid projectPermit valid
41.9 MW hybrid projectPermit valid
41.9 MW hybrid projectPermit valid
41.9 MW hybrid projectPermit valid
41.9 MW hybrid projectPermit valid
41.9 MW hybrid projectPermit valid
41.9 MW hybrid projectPermit valid