Wind farms in Tulcea

In Tulcea County, 33 wind projects above 1 MW are requesting grid connection, 2,461 MW in total. 25 have a signed connection contract.

The largest is 394.1 MW, and 19 projects exceed 50 MW. 7 projects hold a valid grid permit, and 1 has an expired permit.

ProjectStage
394.1 MW wind farmPermit valid
193.7 MW wind farmPermit valid
180.8 MW wind farmPermit valid
175.4 MW wind farmPermit valid
151.0 MW wind farmConnection contract
148.4 MW wind farmConnection contract
126.9 MW wind farmConnection contract
108.8 MW wind farmConnection contract
99.0 MW energy projectConnection contract
98.6 MW wind farmPermit valid
96.7 MW wind farmConnection contract
87.5 MW wind farmConnection contract
78.6 MW wind farmConnection contract
76.1 MW wind farmPermit valid
70.0 MW wind farmConnection contract
70.0 MW wind farmConnection contract
58.5 MW wind farmConnection contract
58.5 MW wind farmConnection contract
57.0 MW wind farmConnection contract
35.4 MW wind farmPermit valid
27.0 MW wind farmConnection contract
17.5 MW wind farmPermit expired
10.0 MW wind farmConnection contract
6.9 MW wind farmConnection contract
6.7 MW energy projectConnection contract
6.7 MW wind farmConnection contract
6.2 MW wind farmConnection contract
6.0 MW wind farmConnection contract
2.6 MW wind farmConnection contract
1.9 MW wind farmConnection contract
1.4 MW wind farmConnection contract
1.4 MW wind farmConnection contract
1.2 MW wind farmConnection contract