Solar PV parks in Tulcea

In Tulcea County, 26 solar PV projects above 1 MW are requesting grid connection, 198 MW in total. 17 have a signed connection contract.

The largest is 50.7 MW. 6 projects hold a valid grid permit, and 3 have an expired permit.

ProjectStage
50.7 MW solar PV parkPermit valid
39.9 MW solar PV parkConnection contract
23.8 MW solar PV parkConnection contract
7.8 MW solar PV parkPermit expired
6.9 MW solar PV parkPermit valid
6.3 MW solar PV parkConnection contract
5.1 MW solar PV parkConnection contract
4.9 MW solar PV parkConnection contract
4.5 MW solar PV parkConnection contract
4.5 MW solar PV parkPermit valid
4.5 MW solar PV parkConnection contract
4.5 MW solar PV parkPermit valid
4.2 MW solar PV parkConnection contract
3.0 MW solar PV parkConnection contract
3.0 MW solar PV parkPermit valid
2.9 MW solar PV parkConnection contract
2.9 MW solar PV parkPermit valid
2.6 MW solar PV parkConnection contract
2.6 MW solar PV parkConnection contract
2.4 MW solar PV parkConnection contract
2.3 MW solar PV parkConnection contract
2.1 MW solar PV parkPermit expired
2.0 MW solar PV parkConnection contract
2.0 MW solar PV parkPermit expired
1.5 MW solar PV parkConnection contract
1.0 MW solar PV parkConnection contract