Wind farms in Galați

In Galați County, 20 wind projects above 1 MW are requesting grid connection, 1,723 MW in total. 14 have a signed connection contract.

The largest is 629.2 MW, and 10 projects exceed 50 MW. 6 projects hold a valid grid permit.

ProjectStage
629.2 MW wind farmConnection contract
150.5 MW wind farmConnection contract
117.8 MW wind farmConnection contract
98.6 MW wind farmConnection contract
95.9 MW wind farm · ScânteieștiConnection contract
72.0 MW wind farm · CorodConnection contract
66.0 MW wind farmConnection contract
61.6 MW wind farm · TuluceștiPermit valid
56.0 MW wind farm · TuluceștiPermit valid
50.0 MW wind farmConnection contract
49.6 MW wind farm · Slobozia ConachiPermit valid
48.5 MW wind farmPermit valid
44.8 MW wind farmPermit valid
42.2 MW wind farmConnection contract
36.0 MW wind farm · Cuza VodăConnection contract
36.0 MW wind farm · FrumușițaConnection contract
24.0 MW wind farmConnection contract
21.6 MW wind farmPermit valid
12.0 MW wind farm · TuluceștiConnection contract
10.3 MW wind farm · BăleniConnection contract

Other counties