Solar PV parks in Galați
In Galați County, 23 solar PV projects above 1 MW are requesting grid connection, 248 MW in total. 11 have a signed connection contract.
The largest is 51.0 MW. 11 projects hold a valid grid permit, and 1 has an expired permit.
| Project | Stage |
|---|---|
| 51.0 MW solar PV park | Permit valid |
| 39.9 MW solar PV park · Umbrărești | Permit valid |
| 39.9 MW solar PV park · Umbrărești | Permit valid |
| 19.2 MW solar PV park · Târgu Bujor | Connection contract |
| 15.9 MW solar PV park | Permit valid |
| 12.8 MW solar PV park | Permit valid |
| 12.4 MW solar PV park | Permit valid |
| 10.6 MW solar PV park · Cosmești | Permit valid |
| 9.0 MW solar PV park | Permit valid |
| 4.9 MW solar PV park · Galați | Connection contract |
| 4.0 MW solar PV park · Galați | Connection contract |
| 3.9 MW solar PV park | Connection contract |
| 3.8 MW solar PV park | Connection contract |
| 3.2 MW solar PV park | Connection contract |
| 3.0 MW solar PV park · Galați | Connection contract |
| 2.2 MW solar PV park · Șendreni | Connection contract |
| 2.1 MW solar PV park · Galați | Permit valid |
| 2.0 MW solar PV park · Galați | Permit valid |
| 2.0 MW solar PV park · Galați | Connection contract |
| 1.9 MW solar PV park · Negrilești | Permit expired |
| 1.8 MW solar PV park · Grivița | Connection contract |
| 1.6 MW solar PV park | Permit valid |
| 1.1 MW solar PV park · Galați | Connection contract |
Other counties
- Alba38
- Arad90
- Argeș50
- Bacău24
- Bihor67
- Bistrița-Năsăud14
- Botoșani21
- Brașov57
- Brăila69
- Bucharest14
- Buzău37
- Caraș-Severin35
- Călărași56
- Cluj34
- Constanța112
- Covasna20
- Dâmbovița55
- Dolj129
- Giurgiu43
- Gorj73
- Harghita13
- Hunedoara33
- Ialomița25
- Iași27
- Ilfov42
- Maramureș21
- Mehedinți31
- Mureș55
- Neamț20
- Olt79
- Prahova41
- Satu Mare26
- Sălaj20
- Sibiu48
- Suceava16
- Teleorman44
- Timiș107
- Tulcea71
- Vaslui25
- Vâlcea22
- Vrancea25