Hybrid projects in Galați

In Galați County, 5 hybrid projects above 1 MW are requesting grid connection, 586 MW in total. 5 have a signed connection contract.

The largest is 365.8 MW, and 2 projects exceed 50 MW.

ProjectStage
365.8 MW hybrid projectConnection contract
128.0 MW hybrid projectConnection contract
48.0 MW hybrid projectConnection contract
38.4 MW hybrid projectConnection contract
6.0 MW hybrid projectConnection contract

Other counties