Hybrid projects in Constanța

In Constanța County, 9 hybrid projects above 1 MW are requesting grid connection, 2,490 MW in total. 5 have a signed connection contract.

The largest is 750.4 MW, and 7 projects exceed 50 MW. 4 projects hold a valid grid permit.

ProjectStage
750.4 MW hybrid projectPermit valid
425.0 MW hybrid projectPermit valid
340.9 MW hybrid projectPermit valid
317.3 MW hybrid projectConnection contract
223.2 MW hybrid projectConnection contract
220.8 MW hybrid projectConnection contract
196.7 MW hybrid projectPermit valid
Energy project 9.5 MW · CernavodăConnection contract
Energy project 5.7 MW · CernavodăConnection contract